Review the loads
Load list, supply and fault current are reviewed with you.
WETS AI builds industrial power distribution panels in Houston that feed motors, control panels and instruments across a process. Each panel is built to UL 508A with the disconnects, breakers, transformers and DC supplies your system needs, and every output is checked at power-up before it ships.
A power distribution panel takes one incoming supply and splits it safely into the circuits the rest of your system needs, from three-phase motor feeds to 24 VDC for instruments.

A one-line drawing shows how power enters the panel and divides into protected branch circuits.
We start from your load list: every motor, panel and instrument the panel will feed. That sets the incoming rating, the branch protection and the size of the control transformer and DC supplies, with spare capacity agreed up front.
The available fault current at your site sets the short-circuit current rating the panel needs. We select the main and branch devices to meet it and mark the rating on the nameplate.
Before a power distribution panel leaves our shop, we power it up and confirm every circuit behaves as drawn.
Problems found here cost minutes. Found on site, they cost days.
| Check | What we confirm |
|---|---|
| Incoming voltage | Matches the nameplate rating of the panel |
| Phase rotation | Correct, so motors fed from the panel turn the right way |
| Control transformer | Secondary voltage is correct under load |
| 24 VDC power supplies | Output voltage is correct on every supply |
| Branch circuits | Each circuit is energized as drawn and protected as specified |
These checks are part of the 13-point test every panel passes. See testing, FAT and SAT.
Load list, supply and fault current are reviewed with you.
Disconnect, branch protection, transformer and DC supplies are sized.
The panel is assembled, wired, marked and inspected.
Every power-up check is completed and recorded before shipping.
Yes. We size the control transformer for the control load with margin, and check its output at power-up.
Yes. A single panel can provide three-phase motor feeds, 120 VAC control power and protected 24 VDC circuits for instruments.
Yes. We select components to meet the available fault current at your site and mark the short-circuit current rating on the nameplate.
Yes. We can include power meters on the incoming supply or on individual feeders.
Mostly NEMA 1 for clean indoor rooms, NEMA 3R for outdoor sites, NEMA 4 for hose-down areas and NEMA 4X where corrosion is a concern. Tell us where the panel will be installed and we will recommend a rating.
Full-voltage and soft starters, overloads and SCCR for every motor branch.
What the UL 508A label covers, how SCCR is set, and what we check before a panel is labeled.
Terminal blocks, marshalling and wire marking for clean field wiring.
Send your load list or one-line diagram. We will size the panel and quote it, with a schedule.