WETS AI builds control panels exactly to your drawings. Send us your schematics, layout and bill of materials, and our Houston shop assembles, wires, marks and tests each panel to UL 508A, tracks every revision with you, and builds repeat orders the same way every time.
The more complete the package, the faster and more accurate the quote. If something is missing, we will tell you what we need before we price it.

You stay in control of the design. We raise questions before building and return every change as redlines.
We do not change your design. If we find something that does not match, such as a part that does not fit the layout or a wire number that appears twice, we raise it with you and wait for your decision before building it.
Changes made during the build are marked up and returned to you, so your drawings stay accurate for the next order.

OEMs use us to add panel capacity without adding floor space or staff. Every unit of a machine gets the same panel, built from the same released drawings, so field service sees the same layout every time.
System integrators hand us the build so their engineers can stay on design, programming and commissioning. We work to your drawings and standards, and your name stays on the project.
Some customers send complete drawings. Others need help finishing them. Our team can engineer the panel, write the program, or both, so you only manage one supplier.
Yes. We build to the bill of materials you provide. Any substitution is proposed to you and only made with your approval.
Yes. We purchase the components on your bill of materials from trusted manufacturers and distributors.
We raise it before building that part of the panel, agree the fix with you, and return the marked-up drawings.
Yes. We build single prototypes, small batches and repeat orders, all from the same released drawings.
About 16 weeks on average from order to shipment. The real figure depends on panel size and on component lead times, so we confirm a schedule with every quotation.
Control narratives, HAZOP and SIL identification, process flow diagrams and panel drawings.
The 13 checks every panel passes, plus witnessed FAT and SAT on site.
What the UL 508A label covers, how SCCR is set, and what we check before a panel is labeled.
Send us your drawing package and quantities. We will review it and come back with questions, a quotation and a schedule.