Build-to-Print

Build-to-Print Control Panel Assembly

WETS AI builds control panels exactly to your drawings. Send us your schematics, layout and bill of materials, and our Houston shop assembles, wires, marks and tests each panel to UL 508A, tracks every revision with you, and builds repeat orders the same way every time.

What We Need

What to Send Us

The more complete the package, the faster and more accurate the quote. If something is missing, we will tell you what we need before we price it.

  • Electrical schematics
  • Panel layout drawing
  • Bill of materials with part numbers
  • Wire numbering
  • Door layout
  • Testing or FAT requirements
Technician checking a wired control panel against the electrical drawings on a tablet
Checking a wired panel against the drawings
How It Works

How a Build-to-Print Order Runs

You stay in control of the design. We raise questions before building and return every change as redlines.

  • Your drawings stay the master record
  • Questions are raised before any wire is cut
  • Every change comes back to you as a redline
  • Repeat orders are built to the release you approve
Build-to-print flow: the customer releases drawings, WETS AI raises questions, builds and inspects, returns any changes as redlines, the customer releases the update, and repeat units follow that release.
Revision Control

Your Design, Built as Drawn

We do not change your design. If we find something that does not match, such as a part that does not fit the layout or a wire number that appears twice, we raise it with you and wait for your decision before building it.

Changes made during the build are marked up and returned to you, so your drawings stay accurate for the next order.

Electrical schematics and panel layout drawings used to build to print
Electrical schematics and panel layout drawings
Who We Build For

For OEMs and System Integrators

OEMs use us to add panel capacity without adding floor space or staff. Every unit of a machine gets the same panel, built from the same released drawings, so field service sees the same layout every time.

System integrators hand us the build so their engineers can stay on design, programming and commissioning. We work to your drawings and standards, and your name stays on the project.

Need More Than Assembly?

Engineering and Programming When You Need It

Some customers send complete drawings. Others need help finishing them. Our team can engineer the panel, write the program, or both, so you only manage one supplier.

FAQ

Build-to-Print Questions

Do you work from our part numbers?

Yes. We build to the bill of materials you provide. Any substitution is proposed to you and only made with your approval.

Can you source the components?

Yes. We purchase the components on your bill of materials from trusted manufacturers and distributors.

What happens if we find an error in our drawings?

We raise it before building that part of the panel, agree the fix with you, and return the marked-up drawings.

Can you build a single prototype as well as repeat orders?

Yes. We build single prototypes, small batches and repeat orders, all from the same released drawings.

How long does a panel take?

About 16 weeks on average from order to shipment. The real figure depends on panel size and on component lead times, so we confirm a schedule with every quotation.

Related

Related Panels & Services

Design & Engineering

Control narratives, HAZOP and SIL identification, process flow diagrams and panel drawings.

UL 508A Control Panels

What the UL 508A label covers, how SCCR is set, and what we check before a panel is labeled.

Request a Quote

Have Drawings Ready?

Send us your drawing package and quantities. We will review it and come back with questions, a quotation and a schedule.

Call Request a Quote